Building 3D model…

Data Center & Large Load Infrastructure

Data Center Interconnection

How a hyperscale / AI load ties into the grid — utility substation, switchgear, and redundant power conduits feeding the data hall. The orange path traces live power flow.

Substation / racks Power flow path N+1 redundant feed
Drag to orbit · scroll to zoom

Tying hyperscale load to the grid

  • Utility substation and feeder design for hyperscale and AI loads
  • Redundant power architectures and interconnection coordination
  • Thermal-electrical load reconciliation and energization support
  • Infrastructure assessments and high-density / PUE optimization input
Hyperscale
AI & large-load ready
N+1
Redundant power architecture
PUE
High-density optimization input
Energization
Interconnection & commissioning